MUA_Logo
mcmua logo icon

  Morris County
  Municipal Utilties Authority

Drought Warning in Effect as of 11/13/2024

Click here to read about drought conditions.

Transfer Station Info (Tip Fee $111.25/ton)

  • Mt. Olive Mon-Fri 7:30am-3pm; Sat 7:30am-11am
  • Parsippany Mon-Fri 7am-3pm; Sat 7:30am-11am
  • Closed Sundays and Major Holidays
  • No Rental Trucks
  • Payment by Account, Check, Credit Card. No Cash

Facility Information

Morris County
Tilcon of New York, Inc. 
625 Mt. Hope Road
Rockaway,  NJ   07885
Tel: 973-366-7741   Fax: 973-328-8490
Town: Rockaway Township
  • Limitations: Must operate in accordance with exemption from NJDEP approval based on N.J.A.C. 7:26A-1.4(a) #1 and #13
     

    Exemption #1 is states that manufacturers shall not be required to obtain a general or limited approval pursuant to N.J.A.C. 7:26A-3 for the receipt, storage or processing of source separated recyclable materials.

    i. Asphalt manufacturing plants that receive solely source separated recyclable asphalt millings or larger pieces, and preconsumer asphalt shingles or other asphalt-based roofing scrap, or a combination thereof prior to their introduction into the asphalt manufacturing process. The materials shall be delivered to the manufacturing plant directly from the site of generation unless intermediate storage is authorized by the Department.

    Exemption #13 is for recycling yard trimmings for composting i. No more than 10,000 cy/year; ii. Grass clippings shall constitute no more than 10%; iii. not on Green Acres lands; iv. not on county or municipally owned parks or other similar open public spaces; v. The facility is included by administrative action pursuant to the requirements at N.J.A.C. 7:26-6.11 in the solid waste management plan; vi. The composting area shall not exceed three acres. Windrows must have 150 feet buffer for leaves only or 500 foot buffer is grass is included; vii. graded to prevent the accumulation of surface water viii. Perimeter to be separated from any and all adjacent land uses by an visual buffer; ix. The access road shall be fenced or secured; x. Yard trimmings received during times when operator or owner is present; xi. Sign posted that identifies hours; xii. Adequate water supply and fire-fighting equipment; xiii. Operation to follow method of windrow composting set forth at (a) 13xiii(1) through (7) below: (1) Upon receipt, all yard trimmings shall be removed from bags prior to windrow formation except in paper or biodegradable bags; (2) Dry yard trimmings to be moistened to saturation without producing excess runoff; (3) Placed in windrows within the week of receipt; (4) Windrow to positioned in a manner that is perpendicular to contours of ground surface; (5) Windrows to be constructed and reconstructed after each turning to a maximum height of six feet and base not to exceed a 14 feet; (6) Separation of 16 feet to adjacent pile shall be provided; and (7) Windrows shall be turned at a minimum once per month. Windrows shall be turned twice per month when grass clippings are mixed with leaves . Grass shall be mixed at minimum ratio of five parts leaves to one part grass. xiv. Within one year must attend a composting course approved by the Department;

  • Facility Type: Exempted Solid Waste Facility
  • Permit No.: Exempt
  • Block and Lot: Block 20001; Lot 5.01

  •  

Acceptable Material - Recycling

Asphalt Pavement (Recycling) Must be source separated from garbage and Tilcon must be the sole source of this material.