MUA_Logo
mcmua logo icon

  Morris County
  Municipal Utilties Authority

Transfer Station Info (Tip Fee $111.25/ton)

  • Mt. Olive Mon-Fri 7:30am-3pm; Sat 7:30am-11am
  • Parsippany Mon-Fri 7am-3pm; Sat 7:30am-11am
  • Closed Sundays and Major Holidays
  • No Rental Trucks
  • Payment by Account, Check, Credit Card. No Cash

Facility Information

Morris County
David P Bini,Inc,(American Paving Co of Morris Co) 
650 Myrtle Ave
Boonton,  NJ   07005
Tel: 973-334-1458   Fax: 973-334-1468
Email: americanpavofmc@optonline.net
Town: Boonton Town
  • Limitations: 

    Limitations: Must operate in accordance with exemption from NJDEP approval based on N.J.A.C. 7:26A-1.4(a) 20 (operating on a continual basis option)

    Exemption #20 is for a construction company whose construction and demolition activities generates source separated concrete, asphalt, brick, and block, may receive, store, process, and transfer the material provided that: i. The company is the sole generator; ii. The unprocessed material stored in accordance with N.J.A.C. 7:26A-1.4(a)7i, ii, and iii(1) and (4) and all applicable county or municipal laws or regulations; iii. Processing to be conducted at contractor's yard in accordance with either N.J.A.C. 7:26A-1.4(a)7i or ii; iv. A schedule for completion of processing shall be provided to NJDEP along with the written notification required pursuant to N.J.A.C. 7:26A-1.4(b)5. Written notification is required each time the material is to be processed. Processing may not begin until written response from the Department has been received; v. The company shall be sole end-user of the end product and end product shall be used exclusively for future projects of the company. Sale of the processed material is prohibited; and vi. One-year storage of processed material.

  • Facility Type: Exempted Solid Waste Facility
  • Permit No.: Exempt
  • Block and Lot: Block 69; Lot 75.15

  •  

Acceptable Material - Recycling

Asphalt Pavement (Recycling) Must be generated by this construction company as a source separated recycable.
Brick (Recycling) Must be generated by this construction company as a source separated recycable.
Concrete (Recycling) Must be generated by this construction company as a source separated recycable.